It is apparent that members on this forum are pretty serious builders, as am I. Over a seven day period, I tend to clock as many as 20-25 hrs. at the ole’ workbench. I get everything done I need to each day before I build. However, sometimes I feel like this is alot of time. My wife doesn’t mind because she’s deep into W.O.W online and plays quite a bit. Anyway…
Just a curiousity poll. Over a seven day period, how much time do you spend building[?]
I reserve the right to take the 5th. [V] If I’m motivated 5-10. Definately not on a weekly basis. Usually when I first start a build I’m gung-ho, then when it comes painting time, I slow way… down.
This is a tough question. I don’t keep track of how long i work on kits, and i can go for a week or more without touching a kit.
Sometimes i’m busy leaving me tired and sore, which means i like a nap more then painting a model. Other tiems i’m full of energy and can do in 2 days what i sometimes do in over a week. I will also be moving sometime in the next few months and will take up a very demanding job (i’m a welder btw), more over time the better sort of deal. It could be a year befor i build another model.
There is no average and won’t be for a good 5 years.
I get the weekend mornings before the family gets up. I “sleep in?” till 6 or 6:30 so I get an hour or two each of those days. No wonder it takes my four months to finish a model[:O]
Too much depends on “other commitments”, those made by me and those made by others.
I could have a week where I spend 2-3 hours a day at the bench, only getting up to refill the glass or change the CD or channel, then there are the weeks where the hands refuse to work, I have to fill the obligations of husband, father, coach, neighbor, son in law, brother in law and general all around dope that gets volunteered to do things other than kill spiders and lift heavy stuff . Oh, and if the fingers aren’t as pliable as they should be for modeling, it doesn’t matter when you have to haul shingles, move paint around a wall, cut grass, rake leaves, shovel snow,(yes in OCTOBER!), change the oil, etc.
If I could get to the bench for an hour a day I’d be happy, but it usually averages to that amount in a week.
Simply because I have hundreds of kits lieing around waiting to be built and I spend gobs of money to get all the necessary tools to make my modeling more enjoyable.
I try to get 5-10 hours each week but there are times I’ll spend an entire day in the basement working on something. Then not be able to get back down there for a few days.
If I didn’t have any other interests (WW2 reenacting, video games, movies, fiancé) I would spend everyday all day down there.
Tough question to answer. A lot of my modeling time lately has been affected by our home remodeling, and when my daughter is with me every other week. I try to spend a lot of quality time with the kids when she’s here, to help with homework, play video games and watch movies with the family etc.
So… while the remodeling is going on and my daughter is here I’m lucky to get 2 or 3 hours of modeling in.
When the remodeling isn’t going on, and my daughter is at her mom’s I can get as much as 10 to 15 hours in a week, a couple of hours a night. So my modeling time is really sporadic. Every other week is when I can devote some time to building and that’s when my projocts leap forward, then sit for almost a week.
If you have the time and you don’t let it become an obsession or addiction where it supercedes everything else in your normal life, then I don’t see the problem with it. The same thing for modeling. [:P]
It’s easy to spend 20-25 hours (or more) on something that you enjoy doing. What else would you be doing with that time? Watching TV? Sure there are other things you could be doing, but I’m guessing that for many people the time spent on their hobbies is later in the evening when there isn’t much else to do anyways.
The following link is related to mmorpgs, which admittedly I know more about than modeling, but nonetheless it’s an interesting study. The fact to take note of is that the national average for watching TV is 28 hours. The Daedalus Project: MMORPG Hours vs. TV Hours
Hmmmmmmmm well I am home 24/7 and some people would LOVE to be able to work on there build all that time. But for me after all the house cleaning and the dishs and other odds and ends and Ooooo yea getting the kids to and from school and cooking dinner I think I spend about 20hr + or - a week on my build. But now I am in a waiting game. watting on the paint to dry " 3 days " and nothing to do now.
now how about this guys how much time is spent on the forum vs actual modeling time i see here on this question including myself some heavy duty posters
For me, there’s no “standard” for the amount of time at the work bench. My building time will vary between 3 or 4 hours in a week to over 60 hours in a week. The amount of time really depends on several factors including such things as the specific point in construction, outside commitments, and my overall interest in the current subject. I would say my average time at the bench is somewhere between 21 and 35 hours per week. However, since I’m retired and not married, if you account for sleeping/eating/etc, I could potentially spend over 200 hours a week at the bench and no one would care…
I’m 36, married, one three year old girl, another little one due in May, work about 45 hours per week…I’d say I average about an hour and a half per week and that’s if I stay up late on a Friday night. And yes I do consider myself to be a serious builder. Actually I don’t like that term. I’m careful and methodical. Since I can’t put in much time it’s a real killer when I botch a paint job and have to strip the paint, clean the model and redo the whole thing.
When i first start the build it’s 1-2 hours a night. When it comes to the later stages it’s on the whim of the drying times. I’m kinda weird in the aspect that i only have one build going at a time [:O] I have to see it to the end or it drives me nuts
With my work and college schedules, the earliest I get home is 6:00 at night, and that’s only for two or three days (if I’m lucky!). Many times I’m out until 9 or 10 at night, and usually have to get up at around 6 or 7 the next morning. I try and get about an hour a night in if I can, but I think this last week I only got about 3 hours worth of modelling done. (This week it’s picked up a little, because I just began a rather extensive project, my Bv 222 Dockwagen)
I’m working on two projects right now simutainiously, but I only get about 15 min worth of work done on either project each night. Unless I’m REALLY motivated, projects go really, really slow. They pick up right about the time I prime them for paint, and after that I squeeze in every opportunity to finish them that I can. It can take me a year to build something, and a week to prime, paint, and detail it.
Which reminds me… I get home early tonight. Gotta get some work done! [;)][tup]
If I’m in the mood to build, I will spend an hour or two a night on it, maybe all day on a lazy Saturday [:D] but there are more times lately that I have no motivation to build for some reason, I haven’t touched anything for a few days. It comes and goes with me, I’m dying to get outside and go bike riding before it starts staying cold! I think my brain is telling me to use up every nice day outside that I can… it doesn’t help my model building any when I’ve got a brand new bike that has yet to be beaten on any trails to!